Skip to main content
▲ Notice — The Classic and Short Inca Trail close every February for maintenance. Routes outside the Inca Trail network remain open.
IncaTrail.comEvery route to Machu Picchu
RM 333-2026-MCPublished 11 September 2026

Inca Trail permit sale procedure amended

What it means for you

  • Permits for the Classic and Short Inca Trail are still bought through agencies registered with DDC Cusco: the Ministry says agencies continue to take part in the purchase process.
  • Expect your operator to ask for your passport details before it buys: the ticket is issued in your name once payment is confirmed.
  • Your ticket is valid only for the date, route and person named on it. An unused ticket is lost with no refund and no new date, unless documented force majeure applies (arts. 20.3, 24.5, 24.6).
  • Bring the same identity document your operator used to buy the ticket: it is required both to buy and to enter (art. 20.6).
  • Your operator can change the registered guide before entry, through Tu Boleto with supporting documents (art. 19.3); our guide to how permits work gives the cut-off.
  • The availability shown on Tu Boleto is meant to be stock that can really be bought, no longer stock held by reservations that are never paid.
  • How many people may start each day does not change.

What the official resolution says

Published on 11 September 2026. Ministerial Resolution 333-2026-MC renames Chapter III, amends articles 19, 20 and 24, and renames Annexes B, B-1 and B-2 of the Reglamento de Uso Turístico Sostenible de la Red de Caminos Inka del Santuario Histórico de Machupicchu, approved by RM 069-2017-MC. It also repeals the Fifth Complementary Final Provision of that regulation. Its transitory provision gives the Ministry up to ten calendar days to adapt the Tu Boleto platform, followed by a thirty-day trial period; after both, use of the platform under the amended rules is mandatory.

How the Ministry explained it. On the same day the Ministry of Culture and the Ministry of Foreign Trade and Tourism announced the change the amendment serves: the three-hour prior reservation on the Tu Boleto platform is replaced by a direct sale with confirmed payment. The buyer has an initial window of fifteen minutes to pay; once payment is confirmed the ticket is assigned and issued in the visitor's name, and an unpaid slot is released immediately for someone else to buy (Mincetur press release, 11 September 2026).

A thirty-day trial period (marcha blanca) of the new mechanism began on 22 September 2026, after ten days of technical adjustment of the platform (Ministry of Culture press release, 22 September 2026).

The Ministry states that the daily capacity of the Red de Caminos Inka is not modified by these changes.

Source

Resolución Ministerial N.° 333-2026-MC — Modifica la denominación del Capítulo III, los artículos 19, 20 y 24 y la denominación de los Anexos B, B-1 y B-2 del Reglamento de uso Turístico Sostenible de la Red de Caminos Inka (RM 069-2017-MC)
Published by Ministerio de Cultura · Read on 1 November 2026 · Last checked 1 November 2026

Open the official text →

← All rule changes

IncaTrail.com does not sell permits or treks. Every figure on this page names its source and the date it was read.

Sources

  1. Resolución Ministerial N.° 333-2026-MC — modifica los artículos 19, 20 y 24 y los anexos del Reglamento de Uso Turístico de la Red de Caminos Inka (RM 069-2017-MC)Ministerio de Cultura
    • Art. 19.3: an agency may replace the registered guide up to 24 hours before entry
    • Art. 20.3: valid only for the date, circuit and holder recorded; no extension; no refunds except where the regulation expressly provides
    • Art. 20.6: the identity document used to buy the ticket is required both for the purchase and at entry
    • Art. 24.5: a ticket not used on the date recorded loses its validity, with no right to a refund or to rescheduling
    • Art. 24.6: no rescheduling except for documented force majeure or fortuitous events (medical certificate, air ticket, official transit-delay documents), when DDC Cusco grants another entry date subject to availability
    as of 1 November 2026 · retrieved 1 November 2026